The PR-ready task breakdown that turns the Entra deep-dive design into concrete workstreams with acceptance criteria and target file paths: backend provider abstraction (auth/types.ts, providers/supabase.ts and entra.ts, the AUTH_PROVIDER switch in middleware/auth.ts), tenant and group enforcement (lib/auth/roles.ts, middleware/tenantAccess.ts, middleware/requireRole.ts), persistence (tenant-policy migration + first- login bootstrap), frontend provider switch (AuthContext.tsx, login/page.tsx, lib/auth.ts), incremental route hardening, and the testing matrix (unit/integration/security including key rollover). Ends with the staged release strategy (ship as supabase first → staging Entra → controlled per-tenant rollout), a Definition of Done, and the locked product decisions restated. Read to see the task-level implementation plan and which files each piece of the Entra work maps to.

Entra ID PR-Ready Task Breakdown

Epic Goal

Implement Entra ID tenant-installed authentication and group whitelist authorization with minimal divergence from upstream OSS.

Workstream 1: Backend Provider Abstraction

Task 1.1 - Add auth core types

Acceptance Criteria

  • No provider-specific imports.
  • Shared by middleware and providers.

Task 1.2 - Move Supabase validation into provider module

Acceptance Criteria

  • AUTH_PROVIDER=supabase behaves exactly as today.

Task 1.3 - Implement Entra provider

  • Create backend/src/lib/auth/providers/entra.ts.
  • Implement OIDC/JWKS verification and required claim checks.
  • Read name/email from token claims by default; support Graph fallback only when claims are insufficient.

Acceptance Criteria

  • Invalid tokens/claims denied.
  • Valid tokens produce normalized principal.
  • Profile extraction works from claims-first with fallback behavior defined.

Task 1.4 - Wire provider switch in middleware

Acceptance Criteria

  • Provider switch via env.
  • Backward compatibility fields in res.locals retained during migration.

Workstream 2: Tenant and Group Enforcement

Task 2.1 - Add role mapping utility

Acceptance Criteria

  • Admin group membership yields TenantAdmin.
  • Mapping is settings-driven and tenant-configurable.

Task 2.2 - Add tenant access middleware

Acceptance Criteria

  • Unknown/inactive/suspended tenant denied.
  • Disallowed group denied.

Task 2.3 - Add admin guard helper

Acceptance Criteria

  • Admin-only routes protected with consistent 403 behavior.

Workstream 3: Persistence

Task 3.1 - Tenant policy migration

Acceptance Criteria

  • Adds tenant and group policy tables.
  • Migration applies cleanly on existing DBs.

Task 3.2 - Tenant bootstrap behavior

  • Add helper for first-login tenant creation/activation policy.

Acceptance Criteria

  • Auto or manual onboarding mode works via config.

Workstream 4: Frontend Auth Provider Switch

Task 4.1 - Provider-aware AuthContext

Acceptance Criteria

  • Supabase mode remains stable.
  • Entra mode exposes tenant + role info.

Task 4.2 - Login page provider UX

Acceptance Criteria

  • Supabase mode keeps email/password.
  • Entra mode uses the standard Microsoft organizational sign-in UX.

Task 4.3 - Request helper abstraction

Acceptance Criteria

  • Existing caller API remains stable.

Workstream 5: Route Hardening

Task 5.1 - Incremental route enforcement

  • Apply tenant and role checks to sensitive endpoints.

Acceptance Criteria

  • No cross-tenant access.
  • Admin-only endpoints require admin role.

Workstream 6: Testing and Verification

Task 6.1 - Unit tests

  • Claim validation, role mapping, deny-reason mapping.

Task 6.2 - Integration tests

  • Allowed tenant/group success.
  • Disallowed group/tenant fail.
  • Supabase mode regression pass.

Task 6.3 - Security checks

  • Expired token, bad issuer/audience, key rollover handling.

Release Strategy

  1. Deploy with AUTH_PROVIDER=supabase (no behavior change).
  2. Enable Entra in staging with test tenant.
  3. Run deny-path and admin-path checks.
  4. Controlled production rollout by tenant.

Definition of Done

  • Provider switch operational.
  • Entra token + tenant validation in place.
  • Group whitelist role enforcement in place.
  • Supabase fallback remains functional.
  • Fork delta remains modular and upstream-friendly.

Clarified Product Decisions (Locked)

  • Access is granted when a user is in the customer tenant and is a member of at least one whitelisted Entra group.
  • Name/email should come from Entra claims first; Graph is fallback only when required.
  • Admin capability is granted by organization-defined Entra group membership configured in app settings.